MAKE YOUR WORLD BRIGHTER

Your company with Dreams and Future

Installation

Home > PRODUCTS > Installation

Design of Dynamo Room

  • A. Required Conditions of Dynamo Room
    • Places where air required for cooling of heating source (surface of engine, vent pipe, generator, main body and other equipment) and engine combustion can be sufficiently circulated
    • Places convenient for taking out, taking in, operation and maintenance of device.
    • Places where increase in indoor temperature can be suppressed with installation as close to exhaust gas outlet as possible
    • Places where fueling, supply and piping of cooling water are convenient
    • Places where wiring of operating line of generator operation panel and load line area easy and close
    • Places where there is no resonance due to engine noise or vibration and without influence from surrounding (See standards related to noise and vibration of Environmental Office)
    • 환경청, 소음진동 관련기준
  • B. Size of Dynamo-Room
    • Interval between generator and wall: 800 ~ 1000mmm
    • Length to width ratio of geometrical generator: 1 : 1.5 ~ 2.0
    • S : 발전실의 소요면적  /  P : 기관출력(PS)
    • height : 4 ~ 5m (in consideration of vent pipe and chain block device)
    • Foundation (PAD)
      • ① Should endure dynamic load of generator (gross weight during operation, under 1.5 times of static load).
      • ② Length to width ratio should be at least 30cm bigger than the length and width of generator.
      • ③ Determine depth
    • W : 발전기 동하중 (kg) / 2402.8 : 콘크리트 밀도 (kg/) / B : 기초토대의 폭 (m) / L : 기초토대의 길이 (m)
    • 발전기실의 크기
    • 발전기 이미지